northwest production to pad 3

Northwest Production to Pad

, , ,

Northwest moves a 455,000 lbs. 173ft long Demeth Tower 840 miles from production at Broken Arrow, Ok to pad in Mentone, TX. Stood up and set in place.... Read More ›

Northwest’s Temisko Blade Trailer

,

The Northwest Logistics Heavy Haul team travelled 346 permitted miles in 1 day to safely deliver a 44 meter wind turbine blade to a Wind Farm in Oklahoma.... Read More ›

HP Amine Contactor Transport

,

From Fabrication to Foundation, Northwest has safely completed the first stage of an HP Amine Contactor Tower transportation and set project. The 471,031 lbs. tower was loaded onto... Read More ›

Transporting 2 Natural Gas Compressors From Wyoming to North Dakota

Transporting 2 Natural Gas Compressors From Wyoming to North Dakota

Northwest Logistics Heavy Haul simultaneously transported two Natural Gas Compressors from Wyoming to North Dakota. The Compressors weighing a total of 134,000 lbs each, were 23ft wide by... Read More ›

Northwest's First Job with Dual Lane Transporter (DLT)

Northwest’s First Job with Dual Lane Transporter (DLT)

,

The population of Granite, Oklahoma is a little over 2,000 people. A very rural area that has a couple blocks of dense population right in the middle. One... Read More ›

Transporting 160,000lb Gas Compressors to Geary,OK

Transporting 160,000 lb Gas Compressors to Geary, OK

Northwest Logistics Heavy Haul transported one of two natural gas compressor units weighing 160,000 lbs each. Both were oversized & overweight. Our heavy haul rig was equipped with... Read More ›